About the project: For Roffey Homes. £12m. New build D&B project. Negotiated with repeat client. Handover in 2014. Project managed by the client. 80 apartments + 40 hotel bedrooms. Eight storey reinforced concrete framed structure including basement, which contained car parking and gymnasium. Top floor penthouses constructed in light steel frame. ...
Read MoreEardley Hotel, Worthing
About the project: For Roffey Homes. £5m. New build Design and build project. Negotiated with repeat client. The project was managed by the client and was the recipient of a local design award. 30 luxury apartments. 6 storey reinforced concrete frame. Basement car park, formed with contiguous piled wall with ...
Read MoreUniversity of Kent Drama School
About the project: £7m. Contractor’s D&B negotiated on the success of the Innovation Centre on the same campus. Was originally down to be piled. SWP produced a cheaper solution of a raft foundation on vibro compacted ground. Steel frame utilising “Fabsec” beams of non standard bespoke sections fabricated specially for ...
Read MoreDalston Lane Hotel
About the project: £3.5m design build project to deliver a 6 storey Premier Inn hotel on a very congested London site. Piled with steel frame up to podium slab at first floor level. Then timber framed for the next five storeys. An interesting aspect of this project was that the ...
Read MoreSidcup Leisure Centre
About the project: £5m design build project. SWP acted as D&B consultant for GB Solutions who did a series of these sports facilities for various local authorities. It was a steel framed building built on pad foundations with a mezzanine floor level. Externally finished with a combination of curtain walling ...