University of Kent Innovation Centre
About the project:
£6m. Contractor’s D&B. SWP were brought in to value engineer the project and saved twice their fee by reducing piles to 50% of original design. Sloping site dictating terraced car park to rear with reinforced earth walls. The building was also stepped internally with 3 storeys at the front and two at the rear. Steel framed structure with composite floors. Rainwater harvesting was used to supply water to toilet block.