We are pleased to have been appointed by SECAmb to design a new Ambulance vehicle make ready centre for the Brighton area, situated next to `The Keep` and the A270.
The superstructure will be a steelwork portal frame with a steelwork and precast concrete mezzanine levels. The ground floor slab will be ground bearing and the foundations will be traditional strip and pads.
The civil engineering drainage design consisted of the foul water discharging to a main sewer under gravity and the surface water will infiltrate to the upper ground via permeable block paving with integral attenuation storage.
External works hard landscaping civil engineering will be mainly vehicle parking with retaining walls to the boundary to increase the usable parking areas.
Site works are due to start soon and more updates will follow.