We are pleased to have been appointed on this Hotel project by Storm Hotels on behalf of Premier Inns.
This site comprised of a four storey Hotel building with an under croft parking level.
Superstructures above ground floor were timber frame by a specialist supplier. The ground floor was a reinforced concrete podium deck and lower ground floor consisted of reinforced concrete retaining walls, columns and core areas. The foundation was a reinforced concrete raft slab. We were also responsible for the RC detailing of the structural elements.
The civil engineering drainage design consisted of the foul water discharging to a main sewer and the surface water discharging via an attenuation tank and hydro-brake to an existing connection. External works hard landscaping civil engineering was also carried out on this site.