The Hospice`s is complete and it looks really great !

Working alongside the design team and Sunninghill Contractors, all who have turned out a quality product for the Hospice.

The project involved some demolition of parts of the original building, new two storey wings are being constructed for additional bedrooms. Some internal alterations have also been made to the remaining building to improve the general circulation space and family space. The civil engineering required improved access and hard paving with foul and surface water drainage systems connection to the main sewer and to soakaways respectively.

Thanks to Sunninghill for the use of the photographs.