The design is complete for the 5 storey part RC frames building, and construction work has begun on site. SBC Limited are cracking on with the piling installation and RC lower level foundations and crane base installation. The lower frame is now racing on and the SFS upper framing is being detailed by a specialist supplier for delivery soon.

 

Site levels and location of this very slim site have been challenging to create the space required for the accommodation and off-street parking.

 

Drainage is restricted due to the site area and everything has had to be taken off site to main sewers. Tanked and sealed permeable paving has been used as storage for the surface water system.

 

Another interesting and challenging project with SBC. For more information and photos see our website www.swpeast.co.uk